Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13597212
![](http://i.b2b168.com/e/tag_pthy.gif)
- Product Categories
- Friendly Links
Information Name: | ppr pipe prices, in clean pipes (certified), Zhengzhou ppr pipe |
Published: | 2015-01-15 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Hot melt connection PPR pipe connections should be divided into several steps? PPR pipe connections will be applied to a large number of hot-melt technology, in fact, the operation will not be too much trouble, Centennial Pipe PPR pipe connection made concrete steps Detailed. First, have a hot melt tool, even after the power supply, after work tool bright lights can begin to operate. Then according to the length of PPR pipes need to be cut pipe, PPR pipe perpendicular to the ground the first tube, so as to ensure straightness when cutting pipes. Be sure to use scissors or a conduit pipe cutting machine, if not achieve the desired results can also be used sharp hacksaw, but after cutting ppr tube top ten brands, should remove the burr or burrs for PPR pipe. And connecting end must take clean pipes and pipe ppr pipe specifications, there is no guarantee the end face of the drying oils. When PPR pipe installation also in strict accordance with the design requirements of the drawings, then pay attention to the mounting direction PPR pipe. In the direction of the straight pipe and pipe fittings, with the supporting role of the mark, mark the position of PPR pipe to be installed. The last step in the connection pipe ppr top ten brands, to no rotation of the tube into a heated jacket, then just plug into the depth of the marker position. At the same time, but also do not rotate the tube is placed in a heated head above must reach a predetermined position. PPR pipe installed when matters need to pay attention to what? 1, with the traditional metal pipe compared relatively low hardness ppr pipe, ppr pipe rigidity difference in transportation construction and should be protected from the outside world by the power of lead pipe ppr pipe damage, while at the Concealed ppr pipe Road, should cook in position mark the pipe to avoid damage to the pipe in the decoration. 2, when the temperature under 5 ℃ better not construction, because this ppr at low temperature environment pipe has fragility, it is vulnerable to the effects of damage to the pressure pipe, and the pipe should be used when cutting a sharp knife to cut slowly. Do not apply to the installed pipeline gravity oppression, percussion. 3, the exposed long ppr pipe ultraviolet radiation caused by the aging of decomposition, so users should take measures to protect exposed ppr pipe, can be wrapped in a layer of dark protective layer on the pipe. 4, ppr pipe connecting the widespread use of hot melt connection, but when ppr You can use the threaded inserts or flange connection method with a metal pipe when the pipe and connections, as well, and water connections. 5, the linear expansion coefficient of PP-R pipe larger (0.15mm / m ℃), in surface mounted or Dark buried pipeline expansion must be taken to prevent deformation of technical measures apply when piping. Before 6, after the installation of the pipeline to be .ppr then buried by a cold water pipe pressure test to test pressure greater than 1Mpa, is 1.5 times the system pressure. The test pressure is twice as hot water pipe system pressure, but the pressure value can not be less than 1.5MPa. Technical details in accordance with procedures to operate. Ppr pipe prices, in clean pipes (certified), Zhengzhou ppr pipe supplied by Zhejiang Jie Pipeline Co. Zhengzhou office. Zhejiang Jie Pipeline Ltd., Zhengzhou Office (www.pprgc.com) is a leader in Zhengzhou, Henan Province, Sheung Shui system over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In the clean pipes leading staff warmly welcome all inquiries negotiations to create the better future for clean pipes. |
Admin>>>
You are the 20893 visitor
Copyright © GuangDong ICP No. 10089450, Zhejiang Jie Pipeline Limited Zhengzhou Office All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 20893 visitor
Copyright © GuangDong ICP No. 10089450, Zhejiang Jie Pipeline Limited Zhengzhou Office All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility