Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13597212
![](http://i.b2b168.com/e/tag_pthy.gif)
- Product Categories
- Friendly Links
Information Name: | Zhengzhou Zhengzhou to warm the pipe _ _ in warm clean pipes |
Published: | 2014-11-29 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | The connection between the PPR pipe with what method? We all know the way PPR pipe hot melt connection is mainly used to connect. If improper operation of hot melt connection, that is with a good pipe for pipeline installation quality may not be reached. To ensure quality installation and connection to warm Zhengzhou, first be sure to use the factory equipped with hot-melt tools, heat welder heating temperature and time must be in accordance with the regulations. PPR pipe hot melt connection mode, allowing a one-time connection between the pipe and fittings, so concealed when the water supply pipe to the inside wall of the branch, in conjunction with the requirements of the actual situation in the design and construction of the ground, cutting must be accurate. If the pipeline is buried in the ground, buried in the following interface can not be too much. Before the pipeline welding, as well as want to clean the surface of the pipe joint, the top of the oil, and some other substances to remove burrs. Another case of pipe fittings into the inside is not too long, and the connection flange good place to be products are, if not meet the requirements, and some have gaps, it is certainly not up to weld, and after the time when there may be leaking Zhengzhou happen to warm the brand, this time we must immediately reconnect. [Student] PPR pipe construction problems Attention? 1, handling and installation pipes should avoid hitting sharp objects to prevent pipe damage. 2, pipeline installation process should prevent paint and other organic pollutants and pipes, fittings contact. 3, special fittings installed metal pipe with metal inserts connecting Zhengzhou to warm the price, not too much force, so as not to damage the threaded fittings, causing junction leakage. 4, heating pipes and fittings, should prevent over-heating, the thickness of the thin. Pipe deformation in the pipe fittings. 5, when the hot-melt intubation and correction, rotation is strictly prohibited. 6, the operation may not have the fire scene, is strictly prohibited open flame bake bend the pipe. 7, the installation is interrupted or completed at exposure, we must temporarily closed well to avoid debris from entering. Above all finishing work based on actual problems encountered students from, for reference, any questions, please timely communication, correct me. Zhengzhou Zhengzhou to warm the pipe _ _ warm clean pipes in pipe cleaning provided by the Zhejiang Co., Ltd. Zhengzhou office. Zhejiang Jie Pipeline Ltd., Zhengzhou Office (www.pprgc.com) strong, credible, Sheung Shui system in Zhengzhou industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead you hand in cleaning pipes and into the brilliant, for a better future! |
Admin>>>
You are the 20893 visitor
Copyright © GuangDong ICP No. 10089450, Zhejiang Jie Pipeline Limited Zhengzhou Office All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 20893 visitor
Copyright © GuangDong ICP No. 10089450, Zhejiang Jie Pipeline Limited Zhengzhou Office All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility