Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13597212
![](http://i.b2b168.com/e/tag_pthy.gif)
- Product Categories
- Friendly Links
Information Name: | The clean pipe, ppr pipe brand, Pingdingshan ppr pipe |
Published: | 2014-11-03 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | The clean pipe, ppr pipe brand, Pingdingshan Central ppr pipe cleaning pipe available. We are Zhejiang Jie Pipeline Ltd., Zhengzhou Office (www.pprgc.com) at: Zhengzhou specializes in: PP-R hot and cold water pipes, F-PPR performance glass fiber reinforced composite pipes, PP-R aluminum ppr pipe advantage as a new pipe materials, PPR pipe has a unique advantage, it can be used as a cold water pipe, hot water pipes can also be used, because of its non-toxic, light, pressure, corrosion resistance, is becoming a promotional materials, PPR pipe not only apply to cold water pipes, also applies to the hot water pipe ppr pipe fittings, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, fully integrated between the tubes together, so once installed pressure tested, not like the presence of aluminum pipe leaking like a long time, the aging phenomenon, and not scaling PPR pipe, PPR pipe known as Never scaling, never rust, never leakage, green senior water supply materials. Our company is a professional business enterprise ppr pipe, with excellent quality of service and product quality to occupy a broad market. You are welcome to visit our company to negotiate ppr pipe, and sincerely look forward to your arrival. Notes 1, PP-R pipe with a metal tube or water in addition to connecting using threaded inserts or other mechanical connection flange outer ppr pipe prices, and the rest should be using hot melt connection ppr pipe, so that the pipeline integration, no infiltration leak points. 2, PP-R pipe line expansion coefficient larger (0.15mm / m ℃), in surface mounted or buried Concealed pipeline expansion must be taken to prevent deformation technique measures piping. 3, after the pipeline is installed in front of a sealed tube (buried) and cover the decorative layer (non-buried Concealed) must pressure test. Cold water pipe test pressure of 1.5 times the system working pressure, but not less than 1MPa; hot tube test pressure of 2 times the working pressure, but not less than 1.5MPa. Pressure test of time and method of technical rules of order. |
Admin>>>
You are the 20893 visitor
Copyright © GuangDong ICP No. 10089450, Zhejiang Jie Pipeline Limited Zhengzhou Office All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 20893 visitor
Copyright © GuangDong ICP No. 10089450, Zhejiang Jie Pipeline Limited Zhengzhou Office All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility